Malibu High School Building (Phase 1)

Services:

  • CHPS Verified Project Management
  • Energy Modeling (Title 24, CHPS, Net Zero)
  • Daylight Modeling

Location: Malibu, CA
Area: 70,000 square feet
Client/Owner: NAC Architecture / SMMUSD
Building Type: Educational Facility

Verdical Group is providing Collaborative for High Performance Schools (CHPS) Project Management to achieve CHPS verification equivalency; Energy Modeling for Title 24, CHPS, and Net Zero; and Daylight Modeling for SMMUSD’s new Malibu High School Building. The building will be approximately 70,000 square feet, featuring classrooms and multipurpose spaces. Verdical Group is collaborating with the design team to advise on sustainability measures to achieve Net Zero.

 

 

 

LAUSD Dahlia Heights Elementary

Services:

  • CHPS Verified Project Management

Location: Eagle Rock, CA
Area: 7,000 square feet
Client/Owner: Integral Group / LAUSD
Building Type: Educational Facility

Verdical Group is providing Collaborative for High Performance Schools (CHPS) Verified Program Management for LAUSD’s Dahlia Heights Elementary School, designed by Kevin Daly Architects. Through CHPS, the project hopes to improve occupant health, productivity, and performance and achieve reduced operating costs and increased energy savings.